The Challenger One Cogeneration Units are equipped with
• Insulated SEKO Challenger container, complete with ventilation system and soundproofing 65 dB(A) at 10 m
• Electricity generating set consisting of gas engine with heat recovery from:
first stage intercooler; oil; engine cooling water (optional fume heat recovery)
• Gas train complete with dedicated blower
• Silencer in stainless steel 65 dB(A) at 10 m complete with catalyst
• Gas leak supervision system
• Fume development supervision system
• Emergency electric radiator for engine block cooling
• Heat exchanger for use of heat inside the plant (85°C)
• Lubricating oil top-up auxiliary tank complete with electropump for quick oil change
• Biogas cooling and dehumidification system
• Synchronous alternator complete with power board with UTF counter and network protection
• Control and command panel complete with automatic synchronisation system
The Challenger One Cogeneration Units are equipped with:
- Insulated SEKO Challenger container, complete with ventilation system and soundproofing 65 dB(A) at 10 m
- Electricity generating set consisting of gas engine with heat recovery- water oil intercooler (optional fume heat recovery)
- Gas train complete with dedicated blower
- Silencer in stainless steel 65 dB(A) at 10 m complete with catalyst
- Gas leak supervision system
- Fume development supervision system
- Heat exchanger for use of heat inside the plant (85°C)
- Lubricating oil top-up auxiliary tank complete with electropump for quick oil change
- Synchronous alternator complete with power board with UTF counter and network protection
- Control and command panel complete with automatic synchronisation system